
Recent News
View all
MAY 9, 2025
TGRWA is continuing to provide structural engineering services for Shake Shack restaurants throughout the U.S. Nearly 200 projects have been completed since 2012 in over 30 states at some of the country’s most high-profile retail locations and notable...

TGRWA is hiring!
SEP 3, 2025
TGRWA is hiring!
We will be at the UIUC, Purdue, and Iowa State job fairs in the coming weeks looking for candidates for a summer structural engineering internship, summer BIM internship, full-time position starting in December, and full-time position...

TGRWA PROJECTS: NORTHLIGHT THEATER
JUN 10, 2025
Construction is underway for the new theater building located in Evanston, IL. The 25,000 square-foot steel-framed building includes a central auditorium surrounded by a 2-story structure, providing additional preparation and rehearsal spaces, storage...

TGRWA PROJECTS: EMA RESTAURANT
OCT 16, 2024
TGRWA was the Structural Engineer of Record for the new Ema restaurant in Glenview, Illinois. The approximately 7,200 square foot single-story building is steel framed with steel moment frames and light gauge shear walls. Some features of the space...

TGRWA Projects: Tyndall Lodging
FEB 20, 2024
TGRWA has been the structural engineer for several sizeable federal government projects recently, including the new hotel on Tyndall Air Force Base near Panama City, FL. The 220,000 square-foot, 5-story structure provides 360 hotel rooms to the...

TGRWA PROJECTS: 311 W. HURON
MAY 5, 2023
TGRWA is the structural engineer or record for the new mixed-use building located at 311 W. Huron in the River North neighborhood of Chicago. The 220,000 square-foot, 15-story post-tensioned concrete building provides retail at the Ground Floor; (5)...